Procurement and construction of pipes for 10 km with all joints and gates , passing the river and construction of concrete casings , procurement and execution of irrigation system with poly ethylene pipes with different diameters for 342298 meters, execution of soil and concrete required for hydraulic structure, control building , office and watchmen house in operation time.