Pre-loader

Sooamar

  • Client:
    Jihad keshavarzi organization
  • Contract Date:
    2015/04/25
  • Contract Number:
    8183
  • Duration
    18 months
  • Status:
    Finished

Specification

Procurement and construction of pipes for 10 km with all joints and gates , passing the river and construction of concrete casings , procurement and execution of irrigation system with poly ethylene pipes with different diameters for 342298 meters, execution of soil and concrete required for hydraulic structure, control building , office and watchmen house in operation time.