Executive operation of the construction of the main and the secondary irrigation network under the pressure of the Emarat dams riffle,Boran district.
Construction of the main and the secondary irrigation network under the pressure of the Emarat dams riffle,the Boran district includes : pipe-laying operations and the GRP pipes with the diameter of 600 to 1600 mm and a length of about 37 km, polyethylene pipes-laying with a diameter of 50 to 500 mm and a length of 1100 km, installation of 16 mm diameter polyethylene pipes including installation of drip irrigation equipment with a length of 600 km,installation the valves and the relevant accessories ,construction of different vaves pool and stopcocks, drain and relief valve , construction od technical buildings interesecing the pipelines with canals and roads, construction of the deployment chamber of the central control , construction of 87 foundations of the central legs of the center pivots and the founation for pumping station packages, construction of the roads and other exixting buildings , construction of the road and center pivots and central control equipment , works related to the restoration of the diversion dam and sediment discharge systems and sedimentation basin ,purchasing the Central Control equipment for filtration stations an ddrip irrigation and necessary equipment.